top of page
LOT DRAINAGE
Palmer Oaks
The project is a 23 Lot Single Family Subdivision located in the City of Sarasota. Engineering Services included innovative site design to locate the 23 lots within an existing heavily wooded site and preserving many existing features while meeting the lot count required by the developer. Storm water management design included routing historic off-site drainage around the system. A combination of four lakes and related pipes were designed to handle the on-site storm water treatment volume.
Client: Coastal Island Group, LLC.
Client: Coastal Island Group, LLC.
bottom of page